What a Complete Proposal Should Include
A complete proposal should separate removal or excavation, subgrade preparation, aggregate base, asphalt placement, edge restraint where needed, and cleanup. It should identify the asphalt choice, agreed depths, grading plan, equipment, crew expectations, and the project manager you will contact. Ask whether the City of Prescott Community Development Department requires a permit for the specific work. Payment terms should be tied to clear project milestones rather than an unexplained full payment before work begins. Finally, get workmanship, material, cracking, and settling coverage in writing, including exclusions and the recommended seal-coat schedule.
Site, Material, and Weather Factors
Prescott's decomposed-granite soils can require deeper excavation to reach stable subgrade, while granite-heavy ground can drain slowly and make careful grading especially important. Skipping a proper aggregate base can allow movement and cracking within the first year. At roughly 5,300 feet of elevation, freeze-thaw cycles and temperature swings favor a flexible, well-compacted asphalt surface; concrete may last longer but generally costs more and takes longer before use. Ask whether standard hot mix asphalt, recycled asphalt content, or a permeable paving option is appropriate for the lot, budget, and stormwater needs. No mix should be placed on wet base material, and rain during compaction can damage the finished mat.
Common Follow-Up Questions
Can the existing base stay? Only a site assessment can show whether it is stable, deep enough, and properly graded or whether full excavation is needed. How long will the work and curing take? Most residential projects run one to three days, followed by 24-48 hours before light vehicle traffic and up to 7 days for full curing. When should a new driveway be sealed? Wait 6-12 months for the first seal coat, then consider resealing every 2-3 years. How long should the pavement last? Adequate compaction, correct thickness, drainage, early crack repair, and routine sealing support the typical 20-25-year service life described in this guide.